Question 32

An MCB needs to be installed in the PDU of an ICT rack. Which breaking curve should you select?

Options:

A.

D-Curve

B.

C-Curve

C.

B-Curve

D.

A-Curve

Discussion
Inaaya
Are these Dumps worth buying?
Fraser Oct 5, 2025
Yes, of course, they are necessary to pass the exam. They give you an insight into the types of questions that could come up and help you prepare effectively.
Ace
No problem! I highly recommend Cramkey Dumps to anyone looking to pass their certification exams. They will help you feel confident and prepared on exam day. Good luck!
Harris Oct 28, 2025
That sounds amazing. I'll definitely check them out. Thanks for the recommendation!
Alessia
Amazing Dumps. Found almost all questions in actual exam whih I prepared from these valuable dumps. Recommended!!!!
Belle Oct 26, 2025
That's impressive. I've been struggling with finding good study material for my certification. Maybe I should give Cramkey Dumps a try.
Walter
Yayyy!!! I passed my exam with the help of Cramkey Dumps. Highly appreciated!!!!
Angus Oct 14, 2025
YES….. I saw the same questions in the exam.
Kingsley
Do anyone guide my how these dumps would be helpful for new students like me?
Haris Oct 24, 2025
Absolutely! They are highly recommended for anyone looking to pass their certification exam. The dumps are easy to understand and follow, making it easier for you to study and retain the information.
Question 33

What should be implemented when an Inergen-based fire suppression system is installed in the computer room?

Options:

A.

Drainage system under raised floor

B.

Gas tanks need to be within or close to the data center

C.

Pressure release valves in the data center

D.

Proper water leak detection system

Discussion
Question 34

What is the preferred way to measure dust levels in the computer room?

Options:

A.

With an air particle hand-held analyzer

B.

With test coupons

C.

By taking dust samples under the raised floor

D.

By opening up equipment for inspection

Discussion
Question 35

The noise levels in the data center are approximately 91 dB (A).

Do employers need to take precautions?

Options:

A.

No, anything less than 100 dB (A) is acceptable.

B.

There are no regulations regarding noise levels inside a building. Regulations only apply to noise pollution outside of the building.

C.

As long as the data is compliant to ISO/IEC 27001 it is acceptable.

D.

Yes, since it is mandated by regulations.

Discussion