Question 28

A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not available.

What type of generators should be installed?

Options:

A.

Standby generators should be installed in at least an N+1 configuration

B.

Continuous generators should be installed, at least in an N+1 configuration

C.

A combination of standby-, prime-, and continuous-generators, as the duration of the power outage is unpredictable. The total available capacity of the generators should be at least 500% of the data center load

D.

Continuous generators should be installed; no N+1 configuration is needed as the generators will run all the time

Discussion
Mylo
Excellent dumps with authentic information… I passed my exam with brilliant score.
Dominik Oct 20, 2025
That's amazing! I've been looking for good study material that will help me prepare for my upcoming certification exam. Now, I will try it.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Oct 10, 2025
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Madeleine
Passed my exam with my dream score…. Guys do give these dumps a try. They are authentic.
Ziggy Oct 16, 2025
That's really impressive. I think I might give Cramkey Dumps a try for my next certification exam.
Alaia
These Dumps are amazing! I used them to study for my recent exam and I passed with flying colors. The information in the dumps is so valid and up-to-date. Thanks a lot!!!
Zofia Oct 13, 2025
That's great to hear! I've been struggling to find good study material for my exam. I will ty it for sure.
Question 29

Where should raised-floor installation start?

Options:

A.

Point A (entrance corner)

B.

Point B (side wall)

C.

Point C (center of the room)

D.

Point D (corner opposite entrance)

Discussion
Question 30

Which gas-based system in general requires a larger amount of gas in order to be effective, a halocarbon gas-based fire suppression system or an inert gas-based fire suppression system?

Options:

A.

Inert gas requires a smaller amount of gas compared to halocarbon gas

B.

Inert gas requires a larger amount of gas compared to halocarbon gas

C.

Inert gas and halocarbon gas require the same amount of gas

D.

Impossible to answer without knowing the temperature

Discussion
Question 31

ICT rack consumes 3 kW with ΔT ~11 °C (20 °F). Calculate required airflow (CFM).

Options:

A.

~1,500 CFM

B.

~1,000 CFM

C.

~500 CFM

D.

~160 CFM

Discussion