Question 40

Which of the following best describes the concept of total cost management:

Options:

A.

A method of quantifying construction damages where the total job costs are subtracted from the original bid or estimate to determine the total cost amount for a claim

B.

The practices and processes utilized to manage the total life cycle cost investment in a portfolio of strategic assets

C.

A job cost system for ensuring all aspects of a particular manufacturing process are accumulated completely

D.

An integrating process that maps the fields of practice of cost engineering without linking it to project management, resource management, or accounting

Discussion
Question 41

A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of thedesign contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.

According to Maslow's hierarchy of needs, giving the employees an award that acknowledges their achievements is most likely to satisfy which level of need?

Options:

A.

Belonging needs

B.

Safety needs

C.

Power needs

D.

Self-actualization

Discussion
Question 42

Two of the most important things to know when planning a speech or lecture are the ______________and______________ of your audience.

Options:

A.

Motivation, professionalism

B.

Background, attitude

C.

Political preference, sense of humor

D.

Culture, understanding

Discussion
Madeleine
Passed my exam with my dream score…. Guys do give these dumps a try. They are authentic.
Ziggy Oct 16, 2025
That's really impressive. I think I might give Cramkey Dumps a try for my next certification exam.
Nia
Why are these Dumps so important for students these days?
Mary Oct 20, 2025
With the constantly changing technology and advancements in the industry, it's important for students to have access to accurate and valid study material. Cramkey Dumps provide just that. They are constantly updated to reflect the latest changes and ensure that the information is up-to-date.
Josephine
I want to ask about their study material and Customer support? Can anybody guide me?
Zayd Oct 15, 2025
Yes, the dumps or study material provided by them are authentic and up to date. They have a dedicated team to assist students and make sure they have a positive experience.
Hassan
Highly Recommended Dumps… today I passed my exam! Same questions appear. I bought Full Access.
Kasper Oct 17, 2025
Hey wonderful….so same questions , sounds good. Planning to write this week, I will go for full access today.
Question 43

A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.

The recognition of loss of value of a natural resource used in the production process is referred to as:

Options:

A.

Capital reduction

B.

Net loss

C.

Depreciation

D.

Depletion

Discussion