New Year Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

GAQM Updated CLSSBB Exam Questions and Answers by advik

Page: 7 / 13

GAQM CLSSBB Exam Overview :

Exam Name: Certified Lean Six Sigma Black Belt (CLSSBB)
Exam Code: CLSSBB Dumps
Vendor: GAQM Certification: Lean Six Sigma Black Belt Certification
Questions: 357 Q&A's Shared By: advik
Question 28

A machine tool vender wants to sell an injection molding machine. The current machine produces 3.2% defectives. A sample of 1100 from the vender’s machine has 2.9% defective. Do these numbers indicate that the proposed machine has a lower rate of defectives?

Options:

A.

yes

B.

no

Discussion
Kingsley
Do anyone guide my how these dumps would be helpful for new students like me?
Haris Nov 17, 2025
Absolutely! They are highly recommended for anyone looking to pass their certification exam. The dumps are easy to understand and follow, making it easier for you to study and retain the information.
Alessia
Amazing Dumps. Found almost all questions in actual exam whih I prepared from these valuable dumps. Recommended!!!!
Belle Nov 3, 2025
That's impressive. I've been struggling with finding good study material for my certification. Maybe I should give Cramkey Dumps a try.
Honey
I highly recommend it. They made a big difference for me and I'm sure they'll help you too. Just make sure to use them wisely and not solely rely on them. They should be used as a supplement to your regular studies.
Antoni Nov 12, 2025
Good point. Thanks for the advice. I'll definitely keep that in mind.
Stefan
Thank you so much Cramkey I passed my exam today due to your highly up to date dumps.
Ocean Nov 9, 2025
Agree….Cramkey Dumps are constantly updated based on changes in the exams. They also have a team of experts who regularly review the materials to ensure their accuracy and relevance. This way, you can be sure you're studying the most up-to-date information available.
Question 29

After a team has engaged in diversion activities they may need to employ a tool for conversion. Examples of such a tool are:

I. nominal group technique

II. Multivoting

III. cause and effect diagram

IV. activity network diagram

V. matrix diagrams

Options:

A.

III and IV

B.

IV and V

C.

II and III

D.

I and II

Discussion
Question 30

The primary metric for a project is reduced cost for process A .A consequential metric could be:

Options:

A.

reduced cycle time

B.

reduced scrap rate

C.

reduced set-up time

D.

all the above

E.

none of the above

Discussion
Question 31

A team is investigating ways to reduce power outages. They determine that an outage can occur in only three ways: grid failure, local transformer failure or local overload. They then investigate each of these three events for possible causes, etc. They draw a diagram that “fans out” using the power outage as the handle of the fan.

These improvements are best described by which approach to problem solving?

Options:

A.

Affinity diagram

B.

Inter-relationship digraph

C.

Tree diagram

D.

Process decision program chart

E.

Matrix diagram F. Prioritization matrix

F.

Activity network diagram

Discussion
Page: 7 / 13

CLSSBB
PDF

$36.75  $104.99

CLSSBB Testing Engine

$43.75  $124.99

CLSSBB PDF + Testing Engine

$57.75  $164.99