Question 28

A machine tool vender wants to sell an injection molding machine. The current machine produces 3.2% defectives. A sample of 1100 from the vender’s machine has 2.9% defective. Do these numbers indicate that the proposed machine has a lower rate of defectives?

Options:

A.

yes

B.

no

Discussion
Question 29

After a team has engaged in diversion activities they may need to employ a tool for conversion. Examples of such a tool are:

I. nominal group technique

II. Multivoting

III. cause and effect diagram

IV. activity network diagram

V. matrix diagrams

Options:

A.

III and IV

B.

IV and V

C.

II and III

D.

I and II

Discussion
Pippa
I was so happy to see that almost all the questions on the exam were exactly what I found in their Dumps.
Anastasia Feb 9, 2026
You are right…It was amazing! The Cramkey Dumps were so comprehensive and well-organized, it made studying for the exam a breeze.
Kylo
What makes Cramkey Dumps so reliable? Please guide.
Sami Feb 6, 2026
Well, for starters, they have a team of experts who are constantly updating their material to reflect the latest changes in the industry. Plus, they have a huge database of questions and answers, which makes it easy to study and prepare for the exam.
Erik
Hey, I have passed my exam using Cramkey Dumps?
Freyja Feb 19, 2026
Really, what are they? All come in your pool? Please give me more details, I am going to have access their subscription. Please brother, give me more details.
Nadia
Why these dumps are important? Can I pass my exam without these dumps?
Julian Feb 3, 2026
The questions in the Cramkey dumps are explained in detail and there are also study notes and reference materials provided. This made it easier for me to understand the concepts and retain the information better.
Question 30

The primary metric for a project is reduced cost for process A .A consequential metric could be:

Options:

A.

reduced cycle time

B.

reduced scrap rate

C.

reduced set-up time

D.

all the above

E.

none of the above

Discussion
Question 31

A team is investigating ways to reduce power outages. They determine that an outage can occur in only three ways: grid failure, local transformer failure or local overload. They then investigate each of these three events for possible causes, etc. They draw a diagram that “fans out” using the power outage as the handle of the fan.

These improvements are best described by which approach to problem solving?

Options:

A.

Affinity diagram

B.

Inter-relationship digraph

C.

Tree diagram

D.

Process decision program chart

E.

Matrix diagram F. Prioritization matrix

F.

Activity network diagram