Question 28

A machine tool vender wants to sell an injection molding machine. The current machine produces 3.2% defectives. A sample of 1100 from the vender’s machine has 2.9% defective. Do these numbers indicate that the proposed machine has a lower rate of defectives?

Options:

A.

yes

B.

no

Discussion
Addison
Want to tell everybody through this platform that I passed my exam with excellent score. All credit goes to Cramkey Exam Dumps.
Libby Jan 4, 2026
That's good to know. I might check it out for my next IT certification exam. Thanks for the info.
Melody
My experience with Cramkey was great! I was surprised to see that many of the questions in my exam appeared in the Cramkey dumps.
Colby Jan 3, 2026
Yes, In fact, I got a score of above 85%. And I attribute a lot of my success to Cramkey's dumps.
Lennox
Something Special that they provide a comprehensive overview of the exam content. They cover all the important topics and concepts, so you can be confident that you are well-prepared for the test.
Aiza Jan 25, 2026
That makes sense. What makes Cramkey Dumps different from other study materials?
Amy
I passed my exam and found your dumps 100% relevant to the actual exam.
Lacey Jan 24, 2026
Yeah, definitely. I experienced the same.
Miriam
Highly recommended Dumps. 100% authentic and reliable. Passed my exam with wonderful score.
Milan Jan 12, 2026
I see. Thanks for the information. I'll definitely keep Cramkey in mind for my next exam.
Question 29

After a team has engaged in diversion activities they may need to employ a tool for conversion. Examples of such a tool are:

I. nominal group technique

II. Multivoting

III. cause and effect diagram

IV. activity network diagram

V. matrix diagrams

Options:

A.

III and IV

B.

IV and V

C.

II and III

D.

I and II

Discussion
Question 30

The primary metric for a project is reduced cost for process A .A consequential metric could be:

Options:

A.

reduced cycle time

B.

reduced scrap rate

C.

reduced set-up time

D.

all the above

E.

none of the above

Discussion
Question 31

A team is investigating ways to reduce power outages. They determine that an outage can occur in only three ways: grid failure, local transformer failure or local overload. They then investigate each of these three events for possible causes, etc. They draw a diagram that “fans out” using the power outage as the handle of the fan.

These improvements are best described by which approach to problem solving?

Options:

A.

Affinity diagram

B.

Inter-relationship digraph

C.

Tree diagram

D.

Process decision program chart

E.

Matrix diagram F. Prioritization matrix

F.

Activity network diagram