Question 36

Refer to the exhibit.

Questions 36

An administrator creates a security policy that isolates their financial application from accessing the Internet When viewing the policy in Prism Central, several connections from the application are outbound to the Internet.

What is causing this issue with the policy?

Options:

A.

The 0.0.0.0 address was not specified in the outbound rule.

B.

The blocked connections are illustrated for information only.

C.

The Activate box was not checked in the rule, so it is not enforcing.

D.

The policy has been left in monitor mode instead of enforcing mode.

Discussion
Question 37

A consultant is completing final network failover testing on a recently deployed AHV cluster.

The cluster consists of the following:

•Three nodes

•Two uplinks connected to two switches

•Supported SFPs

The consultant removed one SFP+ out of each node. Two of the nodes (Hostl I Host2) failed over to the backup NIC correctly without any interruption but have lost communication with the third node (Host 3) hypervisor/CVM. Inserting the original SFP+ back into the problematic node allowed the network to be connected and the two healthy nodes could communicate successfully again.

manage_ovs showjnterfaces output

manage_ovs showjinterfaces output:

name mode link speed

cthO 10000 True 10000

ethl 10000 False None

eth2 10000 True 10000

eth3 10000 False None

manage_ovs show.uplinks output:

Bridge: brO

Bond: brO-up

bond_mode: active-backup

interfaces: ethl ethO

lacp: off

lacp-fa I 1 back: false

lacp_speed: slow

What should the consultant validate first?

Options:

A.

Validate NIC card on node is seated properly.

B.

Validate that the correct interfaces are included in the bridge.

C.

Validate the customer has configured all their switch ports identically.

D.

Validate the SFP+ is fully plugged into the node and switch.

Discussion
Question 38

What is the default password shipped on new NX hardware from the factory for the ADMIN user on IPMI?

Options:

A.

node-serial-number

B.

nutanix/4u

C.

block-serial-number

D.

ADMIN

Discussion
Ava-Rose
Yes! Cramkey Dumps are amazing I passed my exam…Same these questions were in exam asked.
Ismail Aug 3, 2026
Wow, that sounds really helpful. Thanks, I would definitely consider these dumps for my certification exam.
Ella-Rose
Amazing website with excellent Dumps. I passed my exam and secured excellent marks!!!
Alisha Aug 19, 2026
Extremely accurate. They constantly update their materials with the latest exam questions and answers, so you can be confident that what you're studying is up-to-date.
Atlas
What are these Dumps? Would anybody please explain it to me.
Reign Aug 13, 2026
These are exam dumps for a variety of IT certifications. They have a vast collection of updated questions and answers, which are very helpful in preparing for the exams.
Ayesha
They are study materials that are designed to help students prepare for exams and certification tests. They are basically a collection of questions and answers that are likely to appear on the test.
Ayden Aug 4, 2026
That sounds interesting. Why are they useful? Planning this week, hopefully help me. Can you give me PDF if you have ?
Ayra
How these dumps are necessary for passing the certification exam?
Damian Aug 4, 2026
They give you a competitive edge and help you prepare better.
Question 39

Refer to Exhibit:

Questions 39

A Foundation install must be done on four NX nodes for a new customer. A consultant need to set up the network onsite before imaging the nodes through the Foundation tool.

The nodes are equipped with two SFP28 25GbE NICs with dual ports, and a 10GBase-T NIC with dual ports as well The customer’s ToR switches are 25GbE datacenter switches, already in production.

What is the appropriate hardware to perform the most reliable imaging of these NX nodes?

Options:

A.

A flat Ethernet switch, 4 compatible IGBase-T GBiCs, five Ethernet cables and a laptop.

B.

The 25GbE production switches. 4 DAC cables and 5 Ethernet cables with a flat Ethernet switch, and a laptop.

C.

A flat Ethernet switch. 9 Ethernet cables, and a laptop.

D.

The 25GbE production switches. 4 DAC cables, only one Ethernet cable with a 10GBase-T GBIC, and a laptop.