Weekend Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Nutanix Updated NCS-Core Exam Questions and Answers by mohamad

Page: 4 / 22

Nutanix NCS-Core Exam Overview :

Exam Name: Nutanix Certified Services Core Infrastructure Professional
Exam Code: NCS-Core Dumps
Vendor: Nutanix Certification: NCS Professional
Questions: 302 Q&A's Shared By: mohamad
Question 16

An administrator is deploying an application that requires maximum I/O throughput for scratch data. The administrator is concerned that the throughput requirement is greater than what can be provided by a single cluster node.

What should the administrator do to meet this requirement?

Options:

A.

Create a volume group with several virtual disks and attach to the VM

B.

Create a volume group with one virtual disk attached to the VM

C.

Create a virtual disk attached to the VM's PCI interface

D.

Create several virtual disks attached to the VM's virtual SCSI controller

Discussion
Question 17

A consultant has deployed a Nutanix cluster with AOS 5.10.x, then discovers the customer’s environment is running on AOS 5.6.x. The consultant decides to re-image the cluster using the foundation Java applet. During the Foundation discovery, all cluster nodes display a status of Unavailable.

What should the consultant do to resolve the issue?

Options:

A.

Use the Phoenix ISO

B.

Destroy the cluster.

C.

Restart the Genesis service on the cluster.

D.

Reset the IPMI IP addresses.

Discussion
Question 18

According to Nutanix best practices, which interface configuration should be used when setting up the default bond?

Options:

A.

One 10G uplink only

B.

10G uplinks only or 25G uplinks only

C.

One 10G uplink paired with one 25G uplink

D.

One 1G uplink paired with one 10G uplink

Discussion
Question 19

An administrator responsible for a VDI environment needs to investigate reports of slow logins. The administrator finds that increasing the number of vCPUs from 2 to 4 will reduce the login times. Production workloads are consuming 75% of the host CPU on the cluster. The administrator increases the vCPU count on all of the VDI VMs.

What are two impacts on the cluster? (Choose two.)

Options:

A.

Increase CPU utilization%

B.

Increase CPU ready%

C.

Increase memory utilization%

D.

Increasing CPU counts will decrease memory utilization

Discussion
Osian
Dumps are fantastic! I recently passed my certification exam using these dumps and I must say, they are 100% valid.
Azaan (not set)
They are incredibly accurate and valid. I felt confident going into my exam because the dumps covered all the important topics and the questions were very similar to what I saw on the actual exam. The team of experts behind Cramkey Dumps make sure the information is relevant and up-to-date.
Atlas
What are these Dumps? Would anybody please explain it to me.
Reign (not set)
These are exam dumps for a variety of IT certifications. They have a vast collection of updated questions and answers, which are very helpful in preparing for the exams.
Ava-Rose
Yes! Cramkey Dumps are amazing I passed my exam…Same these questions were in exam asked.
Ismail (not set)
Wow, that sounds really helpful. Thanks, I would definitely consider these dumps for my certification exam.
Lennie
I passed my exam and achieved wonderful score, I highly recommend it.
Emelia (not set)
I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Carson
Yeah, definitely. I would definitely recommend Cramkey Dumps to anyone who is preparing for an exam.
Rufus (not set)
Me too. They're a lifesaver!
Page: 4 / 22
Title
Questions
Posted

NCS-Core
PDF

$35  $99.99

NCS-Core Testing Engine

$42  $119.99

NCS-Core PDF + Testing Engine

$56  $159.99