Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-AP-ID+C Exam Questions and Answers by ares

Page: 6 / 7

USGBC LEED-AP-ID+C Exam Overview :

Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Exam Code: LEED-AP-ID+C Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 100 Q&A's Shared By: ares
Question 24

Which of the following fixtures requires a WaterSense label (or local equivalent for projects outside the US)?

Options:

A.

A tankless toilet

B.

A waterless urinal

C.

An existing showerhead

D.

A private lavatory faucet

Discussion
Question 25

A proposed LEED project will be located within the boundary of a development that has been successfully certified at the Silver level under LEED for Neighborhood Development. The project will earn 10 points from the Location and Transportation Credit, LEED for Neighborhood Development Location. How many additional credit points are available to the project team under the Location and Transportation category?

Options:

A.

Zero additional points are available under the Location and Transportation category

B.

Two additional points are available only in Location and Transportation Reduced Parking Footprint

C.

Eight additional points are available under the Location and Transportation category

D.

18 additional points are available under the Location and Transportation category

Discussion
Question 26

A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

Options:

A.

Compliance Path 1: Prescriptive Achievement; product cutsheets

B.

Compliance Path 2: Usage-Based Calculation; indoor water use calculations

C.

Compliance Path 1: Prescriptive Achievement; indoor water use calculations

D.

Compliance Path 2. Usage-Based Calculation; prescriptive compliance confirmation

Discussion
Question 27

The site of a new open-plan office building is located near a highway. The acoustic consultant is investigating the possibility of using sound masking system to cover the noise impact from the busy road. If sound masking is found to be a feasible option, the noise design of the project can have a maximum limit up to

Options:

A.

36 dBA

B.

48 dBA

C.

62 dBA

D.

70 dBA

Discussion
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby Jul 9, 2026
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Josephine
I want to ask about their study material and Customer support? Can anybody guide me?
Zayd Jul 24, 2026
Yes, the dumps or study material provided by them are authentic and up to date. They have a dedicated team to assist students and make sure they have a positive experience.
Kingsley
Do anyone guide my how these dumps would be helpful for new students like me?
Haris Jul 4, 2026
Absolutely! They are highly recommended for anyone looking to pass their certification exam. The dumps are easy to understand and follow, making it easier for you to study and retain the information.
Ava-Rose
Yes! Cramkey Dumps are amazing I passed my exam…Same these questions were in exam asked.
Ismail Jul 4, 2026
Wow, that sounds really helpful. Thanks, I would definitely consider these dumps for my certification exam.
Rosalie
I passed. I would like to tell all students that they should definitely give Cramkey Dumps a try.
Maja Jul 9, 2026
That sounds great. I'll definitely check them out. Thanks for the suggestion!
Page: 6 / 7

LEED-AP-ID+C
PDF

$36.75  $104.99

LEED-AP-ID+C Testing Engine

$43.75  $124.99

LEED-AP-ID+C PDF + Testing Engine

$57.75  $164.99