Question 16

The Commissioning Authority (CxA) must report results, findings and recommendations directly to the

Options:

A.

owner

B.

architect

C.

contractor

D.

project manager

Discussion
Freddy
I passed my exam with flying colors and I'm confident who will try it surely ace the exam.
Aleksander Oct 19, 2025
Thanks for the recommendation! I'll check it out.
Peyton
Hey guys. Guess what? I passed my exam. Thanks a lot Cramkey, your provided information was relevant and reliable.
Coby Oct 17, 2025
Thanks for sharing your experience. I think I'll give Cramkey a try for my next exam.
Kingsley
Do anyone guide my how these dumps would be helpful for new students like me?
Haris Oct 24, 2025
Absolutely! They are highly recommended for anyone looking to pass their certification exam. The dumps are easy to understand and follow, making it easier for you to study and retain the information.
Miriam
Highly recommended Dumps. 100% authentic and reliable. Passed my exam with wonderful score.
Milan Oct 15, 2025
I see. Thanks for the information. I'll definitely keep Cramkey in mind for my next exam.
Question 17

Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?

Options:

A.

Taxes and delivery costs

B.

Taxes and installation costs

C.

Installation equipment and labor

D.

Transportation costs and installation labor

Discussion
Question 18

A project has performed an energy model which has resulted in the following energy end use consumption:

Questions 18

To meet the requirements for Energy and Atmosphere Credit, Advanced Energy Metering, Option 2. Advanced Metering, energy meters must be installed for energy end uses in

Options:

A.

space cooling, interior fans and receptacles

B.

interior lighting, space heating, space cooling and interior fans

C.

interior lighting, space heating, space cooling, interior fans and receptacles

D.

exterior lighting, interior lighting, space heating, space cooling, interior fans, service water heating and receptacles

Discussion
Question 19

In addition to the basic requirements for Energy and Atmosphere, Fundamental Commissioning and Verification, which is required to achieve Energy and Atmosphere, Enhanced Commissioning, Option 1?

Options:

A.

Develop and implement a commissioning plan

B.

Review the contractor's submittals for compliance with design documents

C.

Verify the installation and performance of the systems being commissioned

D.

Review the owner's requirements and the basis of design for clarity and completeness