| Exam Name: | ISTQB Certified Tester Foundation Level (CTFL v4.0) | ||
| Exam Code: | ISTQB-CTFL Dumps | ||
| Vendor: | ISTQB | Certification: | Foundation Level |
| Questions: | 399 Q&A's | Shared By: | azalea |
Use Scenario 1 “Happy Tomatoes” (from the previous question).
When running test case TC_59, the actual result for t = 35 degrees Celsius is OUTPUT = X instead of the expected output.
Which information should NOT be included in the defect report?
Which ONE of the following statements BEST applies to checklist-based testing?
Following a risk-based testing approach you have designed 10 tests to cover a product risk with a high-risk level. You want to estimate, adopting the three-point test estimation technique, the test effort required to reduce the risk level to zero by executing those 10 tests. You made the following three initial estimates:
• most optimistic = 6 person hours
• most likely = 30 person hours
• most pessimistic = 54 person hours
Based only on the given information, which of the following answers about the three-point test estimation technique applied to this problem is true?
A test score indicator for students produces a performance score based on a combination of the number of consecutive hours studied (below 4 hours, 4 to 8 hours. 9 to 12 hours or above 12 hours) and the average intensity of focus on the material during the study time (low, medium or high).
Given the following test cases:
hours intensity score
T1 3 low55
T2 14 high 95
T3 9 low75
What is the minimum number of additional test cases that are needed to ensure full coverage of all valid INPUT equivalence partitions?