Winter Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

EMC Updated D-ISM-FN-23 Exam Questions and Answers by ellen

Page: 7 / 13

EMC D-ISM-FN-23 Exam Overview :

Exam Name: Dell Information Storage and Management Foundations 2023 Exam
Exam Code: D-ISM-FN-23 Dumps
Vendor: EMC Certification: DCA-ISM
Questions: 189 Q&A's Shared By: ellen
Question 28

What describes an incident in a storage infrastructure?

Options:

A.

Unknown root cause of one or more disruptions to service

B.

Support request to help access an IT resource

C.

Any action that may impact the functionality of the system

D.

Any event that prevents ions of known errors

Discussion
Esmae
I highly recommend Cramkey Dumps to anyone preparing for the certification exam.
Mollie Jan 13, 2026
Absolutely. They really make it easier to study and retain all the important information. I'm so glad I found Cramkey Dumps.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Jan 7, 2026
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub Jan 8, 2026
That's great to hear. I am going to try them soon.
Josie
I just passed my certification exam using their dumps and I must say, I was thoroughly impressed.
Fatimah Jan 4, 2026
You’re right. The dumps were authentic and covered all the important topics. I felt confident going into the exam and it paid off.
Question 29

How should vulnerabilities be managed in a data center environment? (Verify the Correct answer from Associate - Information Storage and Management Study Manual from dellemc.com)

Options:

A.

Minimize the attack surfaces and maximize the work factors

B.

Minimize the attack surfaces and minimize the work factors

C.

Maximize the attack surfaces and minimize the attack vector

D.

Maximize the attack surfaces and maximize the attack vector

Discussion
Question 30

Why is it important to automate the operations management process in a data center environment?

Options:

A.

converts CAPEX to OPEX

B.

mitigates operation management risks

C.

eliminates operational cost

D.

ensures operational agility

Discussion
Question 31

Based on the exhibit, what does the "X" represent in the FCIP tunnel configuration?

Questions 31

Options:

A.

E_port

B.

EX_port

C.

F_port

D.

VE_port

Discussion
Page: 7 / 13

D-ISM-FN-23
PDF

$42  $104.99

D-ISM-FN-23 Testing Engine

$50  $124.99

D-ISM-FN-23 PDF + Testing Engine

$66  $164.99