Exam Name: | VMware vSphere 8.x Advanced Design | ||
Exam Code: | 3V0-21.23 Dumps | ||
Vendor: | VMware | Certification: | VMware Certification |
Questions: | 92 Q&A's | Shared By: | maddie |
During a workshop for a design project, the following information is shared:
Develop and maintain strong relationships with key stakeholders and partners to promote collaboration.
Maintain high standards of quality and professionalism in all aspects of the project.
Build a strong foundation for future projects, including cloud infrastructures.
Ensure project timelines and milestones are met by effectively managing resources and priorities.
Which of these would be classified as a business outcome of the project?
An architect is designing a solution for a customer to meet the following business objectives:
Pass compliance audits
Reuse compute hardware
Grow by 10% per year
Move to a subscription-based consumption model
Which business objective translates as a conceptual model constraint?
An architect is designing the datastore configuration of a new vSphere-based solution.
The following information was obtained during the initial meeting with the customer:
There is currently 500 production and DMZ virtual machine workloads spread evenly across the primary and secondary site.
The profile of the workloads (per site) is as follows:
- DMZ:
-- 75 x Small: 1 vCPU, 2GB RAM, 200 GB disk
- Production:
-- 50 x Small: 1 vCPU, 2 GB RAM, 200 GB disk
-- 100 x Medium: 2 vCPU, 4 GB RAM, 200 GB disk
-- 25 x Large: 4 vCPU, 8 GB RAM, 500 GB disk
The average IO Profile per workload is 70/30 read/write.
The solution should cater to 10% storage growth in the first year.
The solution should cater to 15% virtual machine snapshot overhead.
The storage team has confirmed:
- A scalable external storage array has been deployed per site to support the storage requirements.
- The storage array will connect to all hosts using a dedicated Fibre Channel storage area network fabric.
- Usable storage capacity is available in 10 TB LUNs.
- As many LUNs as required can be provided.
- Every effort should be made to ensure the number of required LUNs is minimized.
The security team has stated that all DMZ and production workloads must remain logically isolated from each other.
Given the information provided, which three design decisions should the architect make to meet the requirements? (Choose three.)
An architect is tasked with designing a new workload domain in an existing VMware Cloud Foundation environment. The customer requirement is to physically separate the NSX host overlay network traffic from other management networks flows.
Which design decision should the architect make to meet this requirement?