Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

VMware Updated 3V0-25.25 Exam Questions and Answers by alisa

Page: 3 / 4

VMware 3V0-25.25 Exam Overview :

Exam Name: VMware Certified Advanced Professional - VMware Cloud Foundation 9.0 Networking
Exam Code: 3V0-25.25 Dumps
Vendor: VMware Certification: VCAP-Networking
Questions: 60 Q&A's Shared By: alisa
Question 12

An administrator is tasked to create a development environment with a Tier-1 gateway to host overlay segments for only East/West workload communication. North/South communication is also required. The solution will not include the following services: NAT, DHCP, VPN. Which step must the administrator take when creating the Tier-1 gateway?

Options:

A.

Configure a Service Interface on the Tier-1 gateway to connect each overlay segment to provide the East/West communication.

B.

Enable route advertisement and connect the Tier-1 gateway to the Tier-0 gateway.

C.

Assign the Tier-1 gateway to an Edge Cluster before any segments are created.

D.

Keep route advertisement disabled and leave the Tier-1 gateway disconnected from any Tier-0 gateway.

Discussion
Kylo
What makes Cramkey Dumps so reliable? Please guide.
Sami Jun 7, 2026
Well, for starters, they have a team of experts who are constantly updating their material to reflect the latest changes in the industry. Plus, they have a huge database of questions and answers, which makes it easy to study and prepare for the exam.
Lennie
I passed my exam and achieved wonderful score, I highly recommend it.
Emelia Jun 15, 2026
I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Hendrix
Great website with Great Exam Dumps. Just passed my exam today.
Luka Jun 21, 2026
Absolutely. Cramkey Dumps only provides the latest and most updated exam questions and answers.
Ernest
That's amazing. I think I'm going to give Cramkey Dumps a try for my next exam. Thanks for telling me about them! CramKey admin please share more questions……You guys are amazing.
Nate Jun 21, 2026
I failed last week, I never know this site , but amazed to see all these questions were in my exam week before. I feel bad now, why I didn’t bother this site. Thanks Cramkey, Excellent Job.
Ilyas
Definitely. I felt much more confident and prepared because of the Cramkey Dumps. I was able to answer most of the questions with ease and I think that helped me to score well on the exam.
Saoirse Jun 27, 2026
That's amazing. I'm glad you found something that worked for you. Maybe I should try them out for my next exam.
Question 13

An administrator created a new Tier-1 Gateway and is attempting to change the connected gateway for a deployed segment to use the new gateway. In the UI, when the administrator clicks the Connected Gateway dropdown, the new Tier-1 gateway is not shown as an available gateway. What would prevent the new Tier-1 gateway from showing in the list of available gateways?

Options:

A.

The Tier-1 Gateway is not connected to an NSX Edge Cluster.

B.

The Tier-1 Gateway connectivity policy is set to "None".

C.

The Tier-1 Gateway and NSX Segment are in different transport zones.

D.

The Tier-1 Gateway and NSX Segment are connected to different Tier-0 Gateways.

Discussion
Question 14

An administrator has observed an NSX Local Manager (LM) outage at the secondary Site. However, the NSX Global Manager (GM) in secondary Site remains operational. What happens to data plane operations and policy enforcement at the secondary site?

Options:

A.

All traffic is blocked until secondary site LM recovers.

B.

Only local policies work; global policies cease to apply on the secondary site.

C.

The data plane operates normally until LM recovery and reconnection.

D.

Secondary site must failover all workloads to Primary site.

Discussion
Question 15

Which two requirements are part of the registration process for Local Manager (LM) to a Global Manager (GM) in NSX for centralized management of network and security services across different workload domains deployed in separate locations? (Choose two.)

Options:

A.

The LM will validate the GM license to perform the GM registration.

B.

The external load balancer VIP is used for NSX Managers without requiring node API certificate updates.

C.

The LM Cluster VIP / FQDN is provided for GM-LM communication.

D.

The IP / FQDN of any of the 3 LM must be used for registration.

E.

The GM-Active requests the LM IP / FQDN and admin credentials for registration.

Discussion
Page: 3 / 4

3V0-25.25
PDF

$36.75  $104.99

3V0-25.25 Testing Engine

$43.75  $124.99

3V0-25.25 PDF + Testing Engine

$57.75  $164.99