| Exam Name: | Nutanix Certified Professional - Multicloud Infrastructure (NCP-MCI v6.10) | ||
| Exam Code: | NCP-MCI-6.10 Dumps | ||
| Vendor: | Nutanix | Certification: | NCM-MCI |
| Questions: | 173 Q&A's | Shared By: | gwen |
An administrator is managing a4-node clusterwithdifferent hardware generations:
Two G5 Nodes→ 2 CPUs (12 cores), 1 SSD (1.92 TB), 2 HDDs (4 TB).
Two G7 Nodes→ 2 CPUs (16 cores), 2 SSDs (1.92 TB), 4 HDDs (4 TB).
The cluster will bedecommissioned from productionand used forDisaster Recovery (DR) purposeswithan RPO of 1 hour.
What is the best approach when replacing G5 nodes without impacting performance?
A new employee has inherited a partially configured Disaster Recovery (DR) schema. Source workloads have been identified and Nutanix Guest Tools has been installed.
There are two Protection Polices in place, one with an asynchronous schedule with a 1-hour RPO and a second policy utilizing synchronous replication. All of these workloads need to be recovered at a DR location and this will be orchestrated by Prism Central Recovery Plans.
What is the best way to setup this recovery orchestration?
Which networking component in AHV is responsible for providing network connectivity to virtual machines?