Spring Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Nutanix Updated NCP-MCI-6.10 Exam Questions and Answers by eoin

Page: 2 / 12

Nutanix NCP-MCI-6.10 Exam Overview :

Exam Name: Nutanix Certified Professional - Multicloud Infrastructure (NCP-MCI v6.10)
Exam Code: NCP-MCI-6.10 Dumps
Vendor: Nutanix Certification: NCM-MCI
Questions: 173 Q&A's Shared By: eoin
Question 8

An administrator has configured AHV Metro with Witness and wants to document different failover scenarios.

As part of the failover tests, the following link losses were simulated:

• Loss of connectivity between the two metro clusters

• Loss of connectivity between the primary cluster and Prism Central

However, Prism Central and the recovery cluster remain connected.

Which two system behaviors are expected? (Choose two.)

Options:

A.

Guest VM I/O operations pause until connectivity between the primary and recovery clusters or the primary cluster and Prism Central is restored.

B.

Guest VM I/O operations pause until connectivity between the primary and recovery clusters or any of the clusters and Prism Central is restored.

C.

Guest VMs continue to run on the primary cluster.

D.

Guest VMs fail over automatically to the recovery cluster.

Discussion
Question 9

An administrator wants toensure that user VMs on AHV hostscan take advantage ofbandwidth beyond a single adapter in a bond.

Which uplink Bond Type should the administrator configure to accomplish this?

Options:

A.

No Uplink Bond

B.

Active-Active

C.

Active-Active with MAC pinning

D.

Active-Backup

Discussion
Question 10

Within Intelligent Operations, Capacity Configurations have been set to Auto Detect for Reserve Capacity For Failure.

For an RF2 cluster with 10 nodes, what effect does this have on Capacity Runway?

Options:

A.

Reserves storage and memory from the largest node to account for a single node failure.

B.

Reserves RAM and CPU from the fastest node to account for a single node failure.

C.

Reserves CPU, RAM and storage from the largest node to account for a single node failure.

D.

Reserves 10% of CPU, memory and storage to account for a single node failure.

Discussion
Ava-Rose
Yes! Cramkey Dumps are amazing I passed my exam…Same these questions were in exam asked.
Ismail Feb 16, 2026
Wow, that sounds really helpful. Thanks, I would definitely consider these dumps for my certification exam.
Josie
I just passed my certification exam using their dumps and I must say, I was thoroughly impressed.
Fatimah Feb 10, 2026
You’re right. The dumps were authentic and covered all the important topics. I felt confident going into the exam and it paid off.
Everleigh
I must say that they are updated regularly to reflect the latest exam content, so you can be sure that you are getting the most accurate information. Plus, they are easy to use and understand, so even new students can benefit from them.
Huxley Feb 8, 2026
That's great to know. So, you think new students should buy these dumps?
Rae
I tried using Cramkey dumps for my recent certification exam and I found them to be more accurate and up-to-date compared to other dumps I've seen. Passed the exam with wonderful score.
Rayyan Feb 5, 2026
I see your point. Thanks for sharing your thoughts. I might give it a try for my next certification exam.
Lennie
I passed my exam and achieved wonderful score, I highly recommend it.
Emelia Feb 7, 2026
I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Question 11

Refer to Exhibit

Questions 11

After adding new workloads, why isOverall Runway below 365 daysandthe scenario still shows the cluster is in good shape?

Options:

A.

Because the Target is 1 month.

B.

Because there are recommended resources.

C.

Because Storage Runway is still good.

D.

Because new workloads are sustainable.

Discussion
Page: 2 / 12

NCP-MCI-6.10
PDF

$36.75  $104.99

NCP-MCI-6.10 Testing Engine

$43.75  $124.99

NCP-MCI-6.10 PDF + Testing Engine

$57.75  $164.99