Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

HP Updated HPE0-S59 Exam Questions and Answers by angus

Page: 6 / 7

HP HPE0-S59 Exam Overview :

Exam Name: HPE Compute Solutions
Exam Code: HPE0-S59 Dumps
Vendor: HP Certification: HPE Technical Certification
Questions: 104 Q&A's Shared By: angus
Question 24

Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.

When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.

What must be done to fix this issue?

Options:

A.

Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.

B.

To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.

C.

The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.

D.

Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.

Discussion
Question 25

Your customer has the following HPE Synergy setup

- 3 HPE Synergy 12000 Frames

- 4 HPE Virtual Connect SE 100 Gb F32 Modules

- 2 HPE Synergy 50 GO Interconnect Link Modules

- 36 HPE Synergy 480 Gen10 Plus compute modules

- 2 HPE Composer 2 modules

Which statement about this setup is true?

Options:

A.

To use all compute nodes, the customer must create at least two logical enclosures

B.

To manage all frames, the customer must buy two additional HPE Composer 2 modules

C.

The customer must buy 36 HPE OneView Advanced licenses to manage compute modules

D.

The customer can add one D3940 storage Module to each of the frames

Discussion
Question 26

Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options - SAS connectivity installed in the first fabric - FC connectivity Installed In the second fabric - Ethernet connectivity installed in the third fabric.

Which statement regarding this setup is true?

Options:

A.

Each compute node must have at least 768GB of memory installed

B.

Interconnect modules that provide SAS connectivity should be moved to the third fabric

C.

Each interconnect module in each fabric must be properly licensed in HPE OneView

D.

Compute nodes must have a second CPU installed to access the second fabric.

Discussion
Conor
I recently used these dumps for my exam and I must say, I was impressed with their authentic material.
Yunus Aug 26, 2025
Exactly…….The information in the dumps is so authentic and up-to-date. Plus, the questions are very similar to what you'll see on the actual exam. I felt confident going into the exam because I had studied using Cramkey Dumps.
Esmae
I highly recommend Cramkey Dumps to anyone preparing for the certification exam.
Mollie Aug 8, 2025
Absolutely. They really make it easier to study and retain all the important information. I'm so glad I found Cramkey Dumps.
Hendrix
Great website with Great Exam Dumps. Just passed my exam today.
Luka Aug 27, 2025
Absolutely. Cramkey Dumps only provides the latest and most updated exam questions and answers.
Robin
Cramkey is highly recommended.
Jonah Aug 5, 2025
Definitely. If you're looking for a reliable and effective study resource, look no further than Cramkey Dumps. They're simply wonderful!
Question 27

Your customer uses HPE OneView to manage their HPE Synergy environment. They plan to use it to manage a new set equipment that includes.

- 20 HPE ProLiant DL365 Gen10 Plus servers

- 20 HPE ProLiant DL380 Gen10 Plus servers

- 5 HPE Primera 650

- 5 HPE MSA 2062 Storage Array

Which statements about now OneView will work with this new equipment are true? (Select two)

Options:

A.

HPE ProLiant DL365 Gen10 Plus servers are not supported in HPE OneView

B.

HPE MSA 2062 Storage Array is not supported in HPE OneView

C.

HPE OneView replaces array management tools for both types of array

D.

HPE ProLiant DL380 Gen10 Plus servers have an HPE OneView license included

E.

HPE Primera 650 can be managed using HPE OneView.

Discussion
Page: 6 / 7

HPE0-S59
PDF

$42  $104.99

HPE0-S59 Testing Engine

$50  $124.99

HPE0-S59 PDF + Testing Engine

$66  $164.99