| Exam Name: | HPE Compute Solutions | ||
| Exam Code: | HPE0-S59 Dumps | ||
| Vendor: | HP | Certification: | HPE Technical Certification |
| Questions: | 157 Q&A's | Shared By: | dillon |
Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer’s needs?
You discovered that somebody deleted the SSO certificate that affects accessing iLO from HPE OneView from an iLO processor in an HPE Synergy compute node.
How will you recover from this problem?
You configured a virtual machine cluster using the HPE Storage Integration Pack for VMware vCenter.
Click the option in the SSMC main menu that you can use to verify whether a virtual storage operation is properly created on HPE Primera or 3PAR.

A junior architect designed a solution based on HPE Synergy that must meet the following requirements:
Support at least 30 HPE Synergy 480 Gen10 Plus compute modules
Interconnect modules must provide MAC and WWN virtualization
All HPE Synergy frames must formulate a single management entity
The management appliance should not be a single point of failure
Connectivity to FC array should be available to all compute nodes
The proposal consists of:
3 HPE Synergy 12000 frames
6 HPE Composer 2 modules
2 HPE Virtual Connect SE 100Gb F32 Module
4 HPE Synergy 50Gb Interconnect Link Module
Which statements about this proposed design are true? (Select two)