Month End Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

VMware Updated 2V0-21.23 Exam Questions and Answers by regan

Page: 3 / 7

VMware 2V0-21.23 Exam Overview :

Exam Name: VMware vSphere 8.x Professional
Exam Code: 2V0-21.23 Dumps
Vendor: VMware Certification: VMware Certification
Questions: 107 Q&A's Shared By: regan
Question 12

An administrator is attempting to configure Storage I/O Control (SIOC) on five datastores within a vSphere environment. The administrator is being asked to determine why SIOC configuration completed successfully on only four of the datastores.

What are two possible reasons why the configuration was not successful? (Choose two.)

Options:

A.

The datastore contains Raw Device Mappings (RDMs).

B.

SAS disks are used for the datastore.

C.

The datastore has multiple extents.

D.

The datastore is using ISCSI.

E.

The administrator is using NFS storage.

Discussion
Question 13

An administrator needs to create affinity rules for the following vSphere cluster setup:

•The cluster contains two virtual machines (VMs) named app01 and app02.

•The cluster contains six hosts named esx11 through esx16.

•The app01 and app02 VMs run software that is licensed to run only on esx11, esx12, or esx13.

•vSphere Distributed Resource Scheduler (DRS) is configured

Which set of steps must the administrator perform to ensure that the licensing requirements are met for app01 and app02?

Options:

A.

1. Add all the hosts to a host group.

2. Create a VM-VM anti-affinity rule for app01 and app02

B.

1. Add the esx11 - esx13 hosts to a host group

2. Create a VM-VM affinity rule for app01 and app02

C.

1 Add the VMs to a VM group and the esx11 - esx13 hosts to a host group.

2 Create a VM-Host required rule between the VM group and the host group.

D.

1. Add the VMs to a VM group and the esx11 - esx13 hosts to a host group.

2. Create a VM-Host preferential rule between the VM group and the host group

Discussion
Question 14

An administrator is tasked with moving an application and guest operating system (OS) running on top of a physical server to a software-defined data center (SDDC) in a remote secure location.

The following constraints apply:

• The remote secure location has no network connectivity to the outside world.

• The business owner is not concerned if all changes in the application make it to the SDDC in the secure location.

• The application's data is hosted in a database with a high number of transactions.

What could the administrator do to create an image of the guest OS and application that can be moved to this remote data center?

Options:

A.

Create a hot clone of the physical server using VMware vCenter Converter.

B.

Create a cold clone of the physical server using VMware vCenter Converter.

C.

Restore the guest OS from a backup.

D.

Use storage replication to replicate the guest OS and application.

Discussion
Josephine
I want to ask about their study material and Customer support? Can anybody guide me?
Zayd Oct 22, 2024
Yes, the dumps or study material provided by them are authentic and up to date. They have a dedicated team to assist students and make sure they have a positive experience.
Mylo
Excellent dumps with authentic information… I passed my exam with brilliant score.
Dominik Aug 29, 2024
That's amazing! I've been looking for good study material that will help me prepare for my upcoming certification exam. Now, I will try it.
Conor
I recently used these dumps for my exam and I must say, I was impressed with their authentic material.
Yunus Sep 13, 2024
Exactly…….The information in the dumps is so authentic and up-to-date. Plus, the questions are very similar to what you'll see on the actual exam. I felt confident going into the exam because I had studied using Cramkey Dumps.
Rae
I tried using Cramkey dumps for my recent certification exam and I found them to be more accurate and up-to-date compared to other dumps I've seen. Passed the exam with wonderful score.
Rayyan Sep 14, 2024
I see your point. Thanks for sharing your thoughts. I might give it a try for my next certification exam.
Question 15

An administrator has mapped three vSphere zones to three vSphere clusters.

Which two statements are true for this vSphere with Tanzu zonal Supervisor enablement? (Choose two.)

Options:

A.

One Supervisor will be created in a specific zone.

B.

One Supervisor will be created across all zones.

C.

Three Supervisors will be created in Linked Mode.

D.

Individual vSphere Namespaces will be placed into a specific zone.

E.

Individual vSphere Namespaces will be spread across all zones.

Discussion
Page: 3 / 7

2V0-21.23
PDF

$36.75  $104.99

2V0-21.23 Testing Engine

$43.75  $124.99

2V0-21.23 PDF + Testing Engine

$57.75  $164.99