Big Cyber Monday Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

USGBC Updated LEED-AP-ND Exam Questions and Answers by malaika

Page: 4 / 7

USGBC LEED-AP-ND Exam Overview :

Exam Name: LEED AP Neighborhood Development (LEED ND)
Exam Code: LEED-AP-ND Dumps
Vendor: USGBC Certification: Leadership in Energy and Environmental Design (LEED)
Questions: 100 Q&A's Shared By: malaika
Question 16

What Is the maximum distance from the project’s geographic center thata community garden outside the project boundary can be located in order to satisfy the requirement for Neighborhood Pattern and Design Credit,Local Food Production?

A)

Questions 16

B)

½ mi. (0.8 km)

C)

Questions 16

D)

Questions 16

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Discussion
Billy
It was like deja vu! I was confident going into the exam because I had already seen those questions before.
Vincent Nov 16, 2025
Definitely. And the best part is, I passed! I feel like all that hard work and preparation paid off. Cramkey is the best resource for all students!!!
Teddie
yes, I passed my exam with wonderful score, Accurate and valid dumps.
Isla-Rose Nov 2, 2025
Absolutely! The questions in the dumps were almost identical to the ones that appeared in the actual exam. I was able to answer almost all of them correctly.
Melody
My experience with Cramkey was great! I was surprised to see that many of the questions in my exam appeared in the Cramkey dumps.
Colby Nov 20, 2025
Yes, In fact, I got a score of above 85%. And I attribute a lot of my success to Cramkey's dumps.
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline Nov 17, 2025
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Question 17

What information is required to determine if a project quality for the Green Infrastructure and Buildings Credit. Wastewater Management?

Options:

A.

Rainwater reuse rate

B.

Cost of installing wastewater system

C.

Average amount of annual wastewater generated

D.

Ability to connect to existing wastewater infrastructure

Discussion
Question 18

A project team has determined that achieving Green Infrastructure and Buildings Credit. Solar Orientation is feasible Based on a preliminary assessment of site features, sunlight and shading, themaximum solar access has been determined. What is the next step the project needs to take to incorporate optimum solar orientation into the site design?

Options:

A.

Determine whether each building can be designed within 15 degrees of geographical east-west

B.

Review local and federal tax incentives and incorporate the monetary value of incentives into the protect budget and site design

C.

Determine the total building square footage in the project and identify all buildings where one axis is at least 2.5 times longer than the others

D.

Study building envelopes and daylighting opportunities for planned development and adjust construction documents to reflect optimum solar orientation

Discussion
Question 19

What agency is responsible for identifying prime and unique sods in agriculture and older associated industries?

Options:

A.

American Farmland Trust or local equivalent

B.

Stale Natural Heritage Program or local equivalent

C.

Natural Resources Conservation Service or local equivalent

D.

Department of Environmental Conservation or local equivalent

Discussion
Page: 4 / 7

LEED-AP-ND
PDF

$36.75  $104.99

LEED-AP-ND Testing Engine

$43.75  $124.99

LEED-AP-ND PDF + Testing Engine

$57.75  $164.99