An administrator has VMs in a container named VMData on Cluster A that need to be replicated to Cluster B. In order to configure new replications to Cluster B, the administrator creates a container named VMData on Cluster B with an advertised capacity of 200GB.
The VMs on Cluster A in the VMData container have these characteristics:
Large VMs taking up 4TB of space
Low data churn rate
100GB of recovery points
NGT is installed
Recovery points are application-consistent
After replications begin the administrator quickly notices replications are not progressing.
What best explains what happened?
An administrator is preparing to configure DR between an on-prem AZ and Nutanix Cloud AZ. Replication fails immediately after configuration. Which prerequisite should be verified?
An administrator is testing the failover scenarios from a source availability zone (AZ1) to a destination availability zone (AZ2). The administrator successfully performs an unplanned failover from AZ1 to AZ2. The administrator then immediately tries to use the unplanned failover option to fail the VM back to AZ1, but does not see the VM listed under Recovery Plan. What could be the cause?
An administrator logs into Prism Central (PC) and notices that a replication of a recovery point is still ongoing from Cluster A to Cluster B on a new setup.
The bytes being replicated aren ' t changing.
Both site ' s virtual IP addresses are reachable.
Connectivity between PC/PE is good.
There is a dedicated LAN between the clusters.
What could be causing this replication to be stuck?