IAM IAM-Certificate Exam Overview :

Exam Name: The Institute of Asset Management Certificate
Exam Code: IAM-Certificate Dumps
Vendor: IAM Certification: IAM Certificate
Questions: 122 Q&A's Shared By: abubakr
Question 28

What is the Asset Life Cycle?

Options:

A.

A strategic and analytical approach to the management of a business’s assets

B.

A project management system

C.

A substitute for quality management

D.

All False

Discussion
Question 29

A public transportation company has a fleet of in total 150 trams. There are 30 of type A (now 25 years old), 50 of type B (now 18 years old) and the remaining are type C (now 2 years old). The expected lifetime of a tram is usually 30 years. You are the asset manager responsible for the operational performance the trams. The current functional and technical performance of type A and B are sufficient, although there are some issues regarding potential obsolescence and availability of spare parts for both types.

What would be a feasible action to do now, considering the scenario?

Options:

A.

Prepare to phase out type A as they are near the end of life

B.

Start an asset rationalisation study on type A (and maybe type B as well) to determine the possible end of life options

C.

Prepare to phase out type A (and possibly type B as well) and replace them by 80 new trams of type C, to standardize the fleet

D.

Prepare an overhaul for type A and B to manage the potential obsolescence issues

E.

Prepare a modification of type A and B to bring back the assets on the required service level and solve the obsolescence problem

Discussion
Question 30

Which of the following would you normally expect to include as key components of the Asset Management Strategy?

Options:

A.

Risk registers, statutory/environmental/financial constraints, O and M manuals, detailed work plans

B.

Maintenance schedules, stakeholder lists, annual financial reports, asset forecasts

C.

Improvement objectives, maintenance schedules, asset forecasts, As-Built drawings

D.

Improvement objectives, strategic risks and opportunities, statutory/environmental/financial constraints, asset forecasts

E.

Strategic risks, constraints, O and M manuals, As-Built drawings

Discussion
Hendrix
Great website with Great Exam Dumps. Just passed my exam today.
Luka Apr 21, 2026
Absolutely. Cramkey Dumps only provides the latest and most updated exam questions and answers.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Apr 23, 2026
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Alessia
Amazing Dumps. Found almost all questions in actual exam whih I prepared from these valuable dumps. Recommended!!!!
Belle Apr 23, 2026
That's impressive. I've been struggling with finding good study material for my certification. Maybe I should give Cramkey Dumps a try.
Victoria
Hey, guess what? I passed the certification exam! I couldn't have done it without Cramkey Dumps.
Isabel Apr 9, 2026
Same here! I was so surprised when I saw that almost all the questions on the exam were exactly what I found in their study materials.
Question 31

Holding equipment spare parts can be expensive. What is the best justification for holding spares?

Options:

A.

When the original equipment manufacturer recommends spares should be held

B.

When cost of downtime or service losses exceeds cost of holding spares

C.

When maintenance is outsourced to a maintainer who doesn't hold spares

D.

The organization has always held spares

E.

The Maintenance Manager wants to hold spares

Discussion
Page: 7 / 8

IAM-Certificate
PDF

$36.75  $104.99

IAM-Certificate Testing Engine

$43.75  $124.99

IAM-Certificate PDF + Testing Engine

$57.75  $164.99