Waratah Hospital, located in Australia, plans to move many data-center services to a new facility. (The remaining legacy data center is not included in this project.) Waratah Hospital has hired an external consultant to help design the new data-center network.
Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The following summarizes the design document.
Requirements and information:
Six racks in the data-center room (a single row).
Redundant top-of-rack leaf switches with back-to-front cooling in every rack, providing 10/25 Gbps connectivity to servers, storage, and other devices.
Four 100 GbE uplinks per leaf switch.
The customer requested that all switch ports face the back of the rack racks (hot aisle).
OOB management for servers, storage, and network must be provided through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
Core equipment for the OOBM network is being reused.
Middle-of-row spine switches.
The data center must connect to the hospital building using links that provide 400 Gbps.
Internet access is supplied through an existing firewall cluster with two firewalls, with one firewall in each data room. The second firewall operates in standby mode, and VRRP is used on the firewalls for failover. The data-center network must connect to these firewalls using links totaling 100 Gbps.
The external link is a dark-fiber direct link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
99.999% uptime for this life-critical environment.
Planned and unplanned downtime must be minimized.
Software upgrades are permitted only once per year with close to zero downtime.
All life-critical resources are accessed locally, and all resources reside within the hospital campus.
Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
In the past, the hospital experienced a security breach that resulted in data loss, network downtime, and identity theft.
Given the scenario, which environmental requirements are stated? Choose two.
To prepare for a data center network implementation, you asked a customer for a list of VLANs to support. The customer’s list for several VMware ESXi hosts includes 4095.
What follow-up question should you ask?
Click the location where you would implement the CX 10000 network-segmentation policy in this data-center deployment.