Question 12

New server equipment is arriving at your data centre, where should it be tested?

Options:

A.

In the Holding area

B.

In the Computer! Server room

C.

In the Media storage area

D.

In the Staging room

Discussion
Question 13

Which source is used in fiber cable to transmit data?

Options:

A.

Signals

B.

Electric

C.

Light

D.

Pulse

Discussion
Kylo
What makes Cramkey Dumps so reliable? Please guide.
Sami Jan 8, 2026
Well, for starters, they have a team of experts who are constantly updating their material to reflect the latest changes in the industry. Plus, they have a huge database of questions and answers, which makes it easy to study and prepare for the exam.
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Jan 7, 2026
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline Jan 9, 2026
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Teddie
yes, I passed my exam with wonderful score, Accurate and valid dumps.
Isla-Rose Jan 22, 2026
Absolutely! The questions in the dumps were almost identical to the ones that appeared in the actual exam. I was able to answer almost all of them correctly.
Question 14

Which one of the following is an Audible Signaling and Notification Device?

Options:

A.

Sirens

B.

Strobes

C.

Alarms

D.

Clocks

Discussion
Question 15

When having two non-synchronized power sources, the ATS / STS need to be of the type:

Options:

A.

Break before make.

B.

Make before break.

C.

Both make before break or break before make can be used.

D.

Both an ATS and STS can never handle two non-synchronized sources.

Discussion
Page: 3 / 6

CDCP
PDF

$36.75  $104.99

CDCP Testing Engine

$43.75  $124.99

CDCP PDF + Testing Engine

$57.75  $164.99