Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: big60

EMC Updated D-MSS-DS-23 Exam Questions and Answers by mari

Page: 3 / 6

EMC D-MSS-DS-23 Exam Overview :

Exam Name: Dell Midrange Storage Solutions Design 2023
Exam Code: D-MSS-DS-23 Dumps
Vendor: EMC Certification: Storage Administrator
Questions: 86 Q&A's Shared By: mari
Question 12

What is done during the preconfigure step of a PowerStore block import migration?

Options:

A.

Source system is added to the PowerStore.

B.

Destination volume is created.

C.

Network connectivity is set up.

D.

Import schedule is set.

Discussion
Question 13

Which network option should be configured to provide the best iSCSI performance on a Dell Unity XT array?

Options:

A.

iSCSI offload

B.

Single VLAN for all traffic

C.

Disable flow control

D.

Jumbo frames

Discussion
Andrew
Are these dumps helpful?
Jeremiah Oct 27, 2024
Yes, Don’t worry!!! I'm confident you'll find them to be just as helpful as I did. Good luck with your exam!
Atlas
What are these Dumps? Would anybody please explain it to me.
Reign Aug 14, 2024
These are exam dumps for a variety of IT certifications. They have a vast collection of updated questions and answers, which are very helpful in preparing for the exams.
Nadia
Why these dumps are important? Can I pass my exam without these dumps?
Julian Oct 22, 2024
The questions in the Cramkey dumps are explained in detail and there are also study notes and reference materials provided. This made it easier for me to understand the concepts and retain the information better.
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari Sep 1, 2024
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Melody
My experience with Cramkey was great! I was surprised to see that many of the questions in my exam appeared in the Cramkey dumps.
Colby Aug 17, 2024
Yes, In fact, I got a score of above 85%. And I attribute a lot of my success to Cramkey's dumps.
Question 14

A systems administrator has deployed a Dell Unity XT 380F system with 15x 1.92 TB SSD drives, in a RAID 5 dynamic pool. Shortly after deployment, the administrator wants to expand the capacity of the system and use larger drives to increase the density. What will happen if the administrator adds 4x 3.84 TB SSD drives?

Options:

A.

The full capacity of the drives will be available.

B.

Only half of the capacity of the new drives will be available.

C.

Three of the drives will be added with a fourth reserved as spare.

D.

The mixing of drive types is not supported, and the operation will fail.

Discussion
Question 15

Which two attributes characterize I/O workloads for sizing the PowerStore storage solution? (Select 2)

Options:

A.

Extent of Serialization

B.

Splitting of Workloads

C.

Random vs. Sequential I/O

D.

Read vs. Write ratios

E.

CloudIQ Reporting

Discussion
Page: 3 / 6

D-MSS-DS-23
PDF

$42  $104.99

D-MSS-DS-23 Testing Engine

$50  $124.99

D-MSS-DS-23 PDF + Testing Engine

$66  $164.99