Pre-Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

EMC Updated D-PVM-OE-01 Exam Questions and Answers by imran

Page: 3 / 11

EMC D-PVM-OE-01 Exam Overview :

Exam Name: Dell PowerMax Operate v.2
Exam Code: D-PVM-OE-01 Dumps
Vendor: EMC Certification: Storage Administrator
Questions: 154 Q&A's Shared By: imran
Question 12

Which VMAX All Flash software package includes Non-Disruptive Migration?

Options:

A.

FX

B.

Essentials

C.

Pro

D.

AppSync Starter

Discussion
Question 13

The Reserved Capacity for a PowerMax Storage Resource Pool (SRP) has been set to 15%. A TimeFinder SnapVX snapshot has been created for a Storage Group containing 10 devices. An application is actively performing read and write I/Os to these devices. The snapshot is linked to the target in Copy mode. Allocation for the SRP reaches 85%.

What will happen to the copy process?

Options:

A.

Array increases compression to free up space

B.

Copy to target will continue and complete

C.

Copy to target will fail

D.

Copy to target will halt

Discussion
Rosalie
I passed. I would like to tell all students that they should definitely give Cramkey Dumps a try.
Maja Apr 8, 2026
That sounds great. I'll definitely check them out. Thanks for the suggestion!
Pippa
I was so happy to see that almost all the questions on the exam were exactly what I found in their Dumps.
Anastasia Apr 2, 2026
You are right…It was amazing! The Cramkey Dumps were so comprehensive and well-organized, it made studying for the exam a breeze.
River
Hey, I used Cramkey Dumps to prepare for my recent exam and I passed it.
Lewis Apr 20, 2026
Yeah, I used these dumps too. And I have to say, I was really impressed with the results.
Alaya
Best Dumps among other dumps providers. I like it so much because of their authenticity.
Kaiden Apr 4, 2026
That's great. I've used other dump providers in the past and they were often outdated or had incorrect information. This time I will try it.
Question 14

A PowerMax 8000 was initially ordered as a multi-engine system. How does this system differ from a PowerMax 8000 that was initially ordered as a single-engine even if it is upgraded to a multi-engine system at a later time?

Options:

A.

Each director has the compression/deduplication module in Slot 9

B.

Each director has one more NVMe Flash module

C.

Each director has one more Universal FE slot

D.

Each director has twice the backend connectivity

Discussion
Question 15

A production PowerMax array has been configured to replicate to a disaster recovery (DR) array using SRDF Adaptive Copy mode. There are occasional bandwidth constraints on the network connecting the two arrays. These bandwidth constraints prevent the immediate replication of production data.

Where does the new production data accumulate until it can be replicated to the array at the DR site?

Options:

A.

Local journal volumes

B.

Local array cache

C.

R1 device

D.

R2 device

Discussion
Page: 3 / 11

D-PVM-OE-01
PDF

$36.75  $104.99

D-PVM-OE-01 Testing Engine

$43.75  $124.99

D-PVM-OE-01 PDF + Testing Engine

$57.75  $164.99