Question 24

Which wall section provides for a two-hour fire-rated wall?

Questions 24

Options:

A.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] regular gypsum board applied to each side, 3/8" [9 mm] regular gypsum board applied to each side

B.

Two layers 1/2" [13 mm] metal studs, regular gypsum board applied to each side

C.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] type X gypsum board applied to each side, 1/4" [6 mm] regular gypsum board applied to each side, 2" [50 mm] glass fiber insulation

D.

1 5/8" [41 mm] metal studs, two layers 1/2" [13 mm] type X gypsum board applied to each side, glass fiber insulation

Discussion
Ivan
I tried these dumps for my recent certification exam and I found it pretty helpful.
Elis Sep 17, 2024
Agree!!! The questions in the dumps were quite similar to what came up in the actual exam. It gave me a good idea of the types of questions to expect and helped me revise efficiently.
Sam
Can I get help from these dumps and their support team for preparing my exam?
Audrey Aug 29, 2024
Definitely, you won't regret it. They've helped so many people pass their exams and I'm sure they'll help you too. Good luck with your studies!
Zayaan
Successfully aced the exam… Thanks a lot for providing amazing Exam Dumps.
Harmony Sep 10, 2024
That's fantastic! I'm glad to hear that their dumps helped you. I also used them and found it accurate.
Wyatt
Passed my exam… Thank you so much for your excellent Exam Dumps.
Arjun Sep 18, 2024
That sounds really useful. I'll definitely check it out.
Carson
Yeah, definitely. I would definitely recommend Cramkey Dumps to anyone who is preparing for an exam.
Rufus Aug 20, 2024
Me too. They're a lifesaver!
Question 25

When special equipment is being leased by a tenant from a third-party vendor, who is typically responsible for the equipment installation after occupancy?

Options:

A.

the tenant

B.

the vendor

C.

the contractor

D.

the building owner

Discussion
Question 26

What is required prior to occupancy to improve indoor air quality?

Options:

A.

clean the air intake vents

B.

run the mechanical system

C.

test carbon monoxide detectors

Discussion
Question 27

The project team is reviewing a mock-up of a faux plaster ceiling finish. The mock-up is a 4'x4' board on an easel in the contractor’s construction trailer. What should the designer request?

Options:

A.

A larger mock-up with the adjacent wall and light fixture finishes

B.

Three mock-ups with different shades of plaster and softer ambient lighting

C.

To view the sample horizontally from below and with lighting similar to the design

Discussion