Question 112

An architectural drawing was created using the SI scale of 1:200. You measure a distance of 13 millimeters on the drawing. What is the actual distance in millimeters?

Options:

A.

5,200mm (5.2m)

B.

260mm

C.

1,300mm (1.3m)

D.

2,600mm (2.6m)

Discussion
Question 113

Horizontal-sync pulses time the edges of an image by defining the point where pixels _____.

Options:

A.

end on the right side of the screen

B.

begin and end at the top and bottom of the screen

C.

begin on the left side of the screen

Discussion
Question 114

Where are tall equipment racks usually mounted?

Options:

A.

To a wall

B.

To the floor

C.

To the ceiling

D.

Equipment racks can't be mounted

Discussion
Andrew
Are these dumps helpful?
Jeremiah Nov 9, 2025
Yes, Don’t worry!!! I'm confident you'll find them to be just as helpful as I did. Good luck with your exam!
Aryan
Absolutely rocked! They are an excellent investment for anyone who wants to pass the exam on the first try. They save you time and effort by providing a comprehensive overview of the exam content, and they give you a competitive edge by giving you access to the latest information. So, I definitely recommend them to new students.
Jessie Nov 16, 2025
did you use PDF or Engine? Which one is most useful?
Lois
I passed my exam with wonderful score. Their dumps are 100% valid and I felt confident during the exam.
Ernie Nov 2, 2025
Absolutely. The best part is, the answers in the dumps were correct. So, I felt confident and well-prepared for the exam.
Erik
Hey, I have passed my exam using Cramkey Dumps?
Freyja Nov 13, 2025
Really, what are they? All come in your pool? Please give me more details, I am going to have access their subscription. Please brother, give me more details.
Question 115

After which of the following activities is an AV project completed?

Options:

A.

All hardware is installed

B.

Software integration is completed

C.

Verification that the system is operational

D.

System closeout activities are completed

Discussion
Page: 28 / 35
Title
Questions
Posted

CTS-I
PDF

$36.75  $104.99

CTS-I Testing Engine

$43.75  $124.99

CTS-I PDF + Testing Engine

$57.75  $164.99