Question 28

Which of the following best describes a thermally-light building?

Options:

A.

A building filled with manufacturing and process equipment

B.

A single-story office building where the load on the heating and cooling system is proportional to the outside air (ambient) temperature

C.

A computer data center housing multiple internet server racks

D.

An underground storage facility

Discussion
Miriam
Highly recommended Dumps. 100% authentic and reliable. Passed my exam with wonderful score.
Milan May 26, 2026
I see. Thanks for the information. I'll definitely keep Cramkey in mind for my next exam.
Anaya
I found so many of the same questions on the real exam that I had already seen in the Cramkey Dumps. Thank you so much for making exam so easy for me. I passed it successfully!!!
Nina May 22, 2026
It's true! I felt so much more confident going into the exam because I had already seen and understood the questions.
Faye
Yayyyy. I passed my exam. I think all students give these dumps a try.
Emmeline May 3, 2026
Definitely! I have no doubt new students will find them to be just as helpful as I did.
Ilyas
Definitely. I felt much more confident and prepared because of the Cramkey Dumps. I was able to answer most of the questions with ease and I think that helped me to score well on the exam.
Saoirse May 12, 2026
That's amazing. I'm glad you found something that worked for you. Maybe I should try them out for my next exam.
Annabel
I recently used them for my exam and I passed it with excellent score. I am impressed.
Amirah May 17, 2026
I passed too. The questions I saw in the actual exam were exactly the same as the ones in the Cramkey Dumps. I was able to answer the questions confidently because I had already seen and studied them.
Question 29

A piece of equipment costs $250,000 to buy and install. The annual operating cost for the equipment is $50,000 per year. The equipment will last 15 years. After 15 years, the equipment will have no net salvage value. The annual interest rate is 10%. What is the present value of the life-cycle cost to own and operate the equipment? Use end-of-year annual cash flow analysis.

Options:

A.

$250,000

B.

$556,945

C.

$630,300

D.

$756,113

Discussion
Question 30

What type of passive heat exchanger can wrap around an evaporator coil to precool entering air and reheat the air after the cooling coil without adding more moisture to the supply air stream?

Options:

A.

Desiccant heat wheel

B.

Plate and frame

C.

Heat pump

D.

Heat pipe

E.

Run-around coil

Discussion
Question 31

If outside air has a temperature of 30°C dry bulb and 20°C wet bulb, what is the dew point temperature?

Options:

A.

15°C

B.

20°C

C.

25°C

D.

30°C

Discussion