Month End Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: get65

Page: 1 / 3

Agile Public Sector ISTQB Agile Public Sector Exam

ISTQB Agile Public Sector Exam

Last Update Apr 29, 2025
Total Questions : 40

To help you prepare for the ISTQB-Agile-Public ISTQB exam, we are offering free ISTQB-Agile-Public ISTQB exam questions. All you need to do is sign up, provide your details, and prepare with the free ISTQB-Agile-Public practice questions. Once you have done that, you will have access to the entire pool of ISTQB Agile Public Sector Exam ISTQB-Agile-Public test questions which will help you better prepare for the exam. Additionally, you can also find a range of ISTQB Agile Public Sector Exam resources online to help you better understand the topics covered on the exam, such as ISTQB Agile Public Sector Exam ISTQB-Agile-Public video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic ISTQB ISTQB-Agile-Public exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 2

Which of the following statements about Agile retrospectives is CORRECT?

SELECT ONE OPTION

Options:

A.  

During Agile retrospectives, testers should be encouraged to provide constructive suggestions only on non-testing activities.

B.  

In an Agile retrospective the moderator can encourage and make sure that good practices are kept by the team, by asking what the team is doing well.

C.  

Agile retrospectives should be focused mainly on impediments that are outside the control of the team because these issues are more challenging.

D.  

Unlike working sessions or meetings held in non Agile projects, Agile retrospectives do not require follow-up activities.

Discussion 0
Questions 3

Which tasks are typically performed by a tester on an Agile project?

i) Implementing test strategy.

ii) Documenting business requirements.

iii) Measuring and reporting test coverage.

iv) Coaching development team in relevant aspects of testing.

v) Executing test-driven development tests.

SELECT ONE OPTION

Options:

A.  

i, iii, iv

B.  

ii, iv, v

C.  

ii, v

D.  

i, iii

Discussion 0
Inaya
Passed the exam. questions are valid. The customer support is top-notch. They were quick to respond to any questions I had and provided me with all the information I needed.
Cillian Oct 20, 2024
That's a big plus. I've used other dump providers in the past and the customer support was often lacking.
Walter
Yayyy!!! I passed my exam with the help of Cramkey Dumps. Highly appreciated!!!!
Angus Nov 4, 2024
YES….. I saw the same questions in the exam.
Sarah
Yeah, I was so relieved when I saw that the question appeared in the exam were similar to their exam dumps. It made the exam a lot easier and I felt confident going into it.
Aaliyah Aug 27, 2024
Same here. I've heard mixed reviews about using exam dumps, but for us, it definitely paid off.
Hendrix
Great website with Great Exam Dumps. Just passed my exam today.
Luka Aug 31, 2024
Absolutely. Cramkey Dumps only provides the latest and most updated exam questions and answers.
Questions 4

You are developing the code that controls an industrial Espresso machine which will be operated by waiting staff in restaurants.

The machine is rather complicated and has lots of switches and buttons, so in the next iteration instructions will be provided to the operator on a small LCD screen.

A User Story for the Operator-Instructions module is as follows:

"As an operator of the Espresso machine, I would like to know how to steam milk, so I can add steamed milk to the coffee."

The following is a list of risks identified for this story, with assigned probability and impact.

Which of these is most correct in the context of the given User Story?

SELECT ONE OPTION

Options:

A.  

An untrained customer will attempt to use the coffee machine. Probability: High. Impact: High

B.  

The instructions may be incorrect or appear in the wrong order. Probability: Low. Impact: High

C.  

Operators will not read the instructions and will try various switches and buttons until something works. Probability: Low. Impact: Low

D.  

A small child may try to steam milk. Probability: High. Impact: Low

Discussion 0
Questions 5

Which of the following statements about the Planning poker test estimate technique are CORRECT?

i) Planning poker is a consensus based technique using a deck of cards.

ii) A low test estimate usually means the story should be broken down into multiple smaller stories.

iii) A high test estimate usually means the story should be broken down into multiple smaller stories.

iv) One poker round is played and then consensus has to be reached.

v) The risk level of each backlog item should be decided before the poker session.

SELECT ONE OPTION

Options:

A.  

i, iii. v

B.  

ii. iv

C.  

i, ii, iii

D.  

ii, iii, iv

Discussion 0

ISTQB-Agile-Public
PDF

$36.75  $104.99

ISTQB-Agile-Public Testing Engine

$43.75  $124.99

ISTQB-Agile-Public PDF + Testing Engine

$57.75  $164.99