To help you prepare for the ATM ISTQB exam, we are offering free ATM ISTQB exam questions. All you need to do is sign up, provide your details, and prepare with the free ATM practice questions. Once you have done that, you will have access to the entire pool of ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012] ATM test questions which will help you better prepare for the exam. Additionally, you can also find a range of ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012] resources online to help you better understand the topics covered on the exam, such as ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012] ATM video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic ISTQB ATM exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 4

An agile development team decides to hire a tester who has always workeD.

- in independent test teams, reporting the problems found in a defect tracking system

- in safety-critical projects, with a stronger focus on the quality of the product than on time and budget.

This agile team is focused on short-term goals to get the product released on time and within budget.

Which of the following answers would you expect to be most likely true in this scenario?

K2 1 credit

Options:

A.  

Agile teams like the presence of a tester in their teams and the tester will be able to adapt to the new context without any issue

B.  

The developers will immediately follow the guidelines described by the tester

C.  

The tester can continue to report the problems found in a defect tracking system and be more focused on the quality than on time and budget constraints

D.  

The tester’s mission could be to verify adherence to requirements, instead of reporting formally the problems in a defect tracking system

Discussion 0
Questions 5

Assume you are working on a CAS (Conditional Access System) for Pay-TV that allows the access, selection and transfer of services and media to authorized users. Authorized users can choose their services through different channels: Web Customer Portal, IVR (Interactive Voice Response), Call Centre and SMS. The system uses a Smart Card to receive and decrypt the broadcasted encrypted control words which allow decrypting pay-per-view TV. Every authorized user must have a Smart Card and a Set-Top Box to view the contents.

The following is an excerpt from the product risk analysis document:

Both likelihood and impact have been rated on the following scale: (1 – Very low, 2 – Low, 3 – Medium, 4 – High, 5 – Very High).

The required test environment and code have been delivered. All test cases for each identified product risk item have been written and are ready to be executed. The Database used to contain the Smart Cards is empty and so only new Smart Cards can be used during test execution.

A Smart Card can only be activated if it has been previously pre-activated. This means the post-conditions for the execution of the test cases to test the pre-activation of the Smart Card are the pre-conditions for activation of the Smart Card.

Which of the following statements represents the most effective contribution of the stakeholders to the completion of the failure mode analysis table?

Questions 5

K4 3 credits

Options:

A.  

The aircraft pilot and the customer representative should contribute to assess the detection. The chief software engineer, the system architect and the expert tester should contribute to assess the priority.

B.  

The aircraft pilot and the customer representative should contribute to assess the priority. The chief software engineer, the system architect and the expert tester should contribute to assess the detection.

C.  

The system architect and the chief software engineer should contribute to assess the priority. The expert tester is the only one who should contribute to assess the detection.

D.  

The aircraft pilot is the only one qualified to contribute to assess the priority and thus should be assigned this task. The customer representative should contribute to assess the detection.

Discussion 0
Questions 6

After the presentation, you are asked to explain the chart.

Assume you have applied a full risk-based testing strategy.

Questions 6

Which of the following answers would you expect to best describe the pie chart?

K4 3 credits

Options:

A.  

All the risk items have been covered with tests. No more risk items remain to test

B.  

According to the full risk-based testing strategy applied, it is very likely that the highest-risk items, tests and bugs remain in the blue and red areas. Therefore, it is very risky to release the application

C.  

Only the lowest-risk items, tests and bugs should remain in the blue and red areas. Therefore the application can be released at any time subject to management of the items identified in those areas

D.  

97 percent of the risk items has been tested. No open bugs or test failures remain. Only 3 percent of risk items remains to be covered by the remaining test

Discussion 0
Atlas
What are these Dumps? Would anybody please explain it to me.
Reign (not set)
These are exam dumps for a variety of IT certifications. They have a vast collection of updated questions and answers, which are very helpful in preparing for the exams.
Fatima
Hey I passed my exam. The world needs to know about it. I have never seen real exam questions on any other exam preparation resource like I saw on Cramkey Dumps.
Niamh (not set)
That's true. Cramkey Dumps are simply the best when it comes to preparing for the certification exam. They have all the key information you need and the questions are very similar to what you'll see on the actual exam.
Vienna
I highly recommend them. They are offering exact questions that we need to prepare our exam.
Jensen (not set)
That's great. I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Nylah
I've been looking for good study material for my upcoming certification exam. Need help.
Dolly (not set)
Then you should definitely give Cramkey Dumps a try. They have a huge database of questions and answers, making it easy to study and prepare for the exam. And the best part is, you can be sure the information is accurate and relevant.
Questions 7

A chart showing the trend in the lag time from defect reporting to resolution during system testing is also available. The chart shows that the daily closure period is consistently and significantly above the rolling closure period for a long period of the system testing phase.

Almost all defects found during system testing have been related to the system as a whole, not related to single units or integrations issues. Almost all quality risks have been addressed during the unit and integration testing phase and no residual quality risks were present in the integrated system. This has been confirmed by exploratory testing sessions performed during system testing, targeted at finding defects in these quality risk areas.

Based on the given information only, which one of the following areas would you expect to be considered more in the retrospective meeting in order to be improved?

K3 3 credits

Options:

A.  

The requirements review

B.  

The defect management process

C.  

The quality risk analysis process

D.  

The system design and architecture design reviews