Week End Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: cram70off

Page: 1 / 3

HPE ATP - Hybrid IT Solutions V2 Delta - Building HPE Hybrid IT Solutions

Delta - Building HPE Hybrid IT Solutions

Last Update Jan 24, 2026
Total Questions : 80

To help you prepare for the HPE0-V15 HP exam, we are offering free HPE0-V15 HP exam questions. All you need to do is sign up, provide your details, and prepare with the free HPE0-V15 practice questions. Once you have done that, you will have access to the entire pool of Delta - Building HPE Hybrid IT Solutions HPE0-V15 test questions which will help you better prepare for the exam. Additionally, you can also find a range of Delta - Building HPE Hybrid IT Solutions resources online to help you better understand the topics covered on the exam, such as Delta - Building HPE Hybrid IT Solutions HPE0-V15 video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic HP HPE0-V15 exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 2

Which web service uses baste CRUD operations performed on resources using HTTP Post, Get. Put. Delete, and Patch?

Options:

A.  

cURL

B.  

REST

C.  

CORBA

D.  

SOAP

Discussion 0
Questions 3

A solution integrator is installing new data center components including an HPE G2 Advanced Rack with two Standard Series G2 PDUs A customer observing the installation process questions whether there will be sufficient power for additional equipment that may be added in the future.

How should the solution integrator respond?

Options:

A.  

HPE G2 Advanced racks allow additional PDUs to be added if additional equipment requires more outlets or more available power

B.  

HPE Standard Series G2 PDUs allow additional inlet power cords to support additional equipment in the future.

C.  

HPE PDUs support elevated temperatures up to 75°C (1673F), in case the additional equipment power draw results in increased heat generation.

D.  

Two HPE Standard G2 PDUs will support 42U of racked equipment, so any equipment added in the future will be accommodated by the current PDU configuration

Discussion 0
Questions 4

A customer is implementing a redundant AD servers to support then lab environment .They have the following requirements

• four rack servers, each with 2 CPUs from AMD. at least 256GB of RAM. FC Dual Port hba

• HPE Nimble AF20 with 17TB useable capacity

• integration into their existing HEP FlexFabric 57io and HPE SN3000B Fibre Channel SAN switches.

it the customer needs more capacity in the future, they will use scale-out growth Which server model should you recommend to this client?

Options:

A.  

ProLiant DL SGOGen10

B.  

ProLiant DL 360 Gen 10

C.  

Proliant DL 385 Gen10

D.  

ProLiant DL 325 Gen10

Discussion 0
Ella-Rose
Amazing website with excellent Dumps. I passed my exam and secured excellent marks!!!
Alisha Dec 15, 2025
Extremely accurate. They constantly update their materials with the latest exam questions and answers, so you can be confident that what you're studying is up-to-date.
Ilyas
Definitely. I felt much more confident and prepared because of the Cramkey Dumps. I was able to answer most of the questions with ease and I think that helped me to score well on the exam.
Saoirse Dec 20, 2025
That's amazing. I'm glad you found something that worked for you. Maybe I should try them out for my next exam.
Hassan
Highly Recommended Dumps… today I passed my exam! Same questions appear. I bought Full Access.
Kasper Dec 22, 2025
Hey wonderful….so same questions , sounds good. Planning to write this week, I will go for full access today.
Carson
Yeah, definitely. I would definitely recommend Cramkey Dumps to anyone who is preparing for an exam.
Rufus Dec 16, 2025
Me too. They're a lifesaver!
Ayra
How these dumps are necessary for passing the certification exam?
Damian Dec 4, 2025
They give you a competitive edge and help you prepare better.
Questions 5

You configured a port on an HPE FiexFabric 5900 series switch that is connected to a VMware ESXi server to support multiple VLANs

interface Ten-GigabitEthernet 1/0/11 description server ESXiOl-ethl port link-type trunk port trunk permit vlan 50 port trunk permit vlan 2 port trunk pvid vlan 50

Given the configuration above, what should happen to any untagged traffic coming from the VMware ESXI host?

Options:

A.  

It will be transmitted in vlan 1.

B.  

It will be dropped

C.  

It will be transmitted in vlan 2

D.  

It will be transmitted in vlan 50.

Discussion 0

HPE0-V15
PDF

$31.5  $104.99

HPE0-V15 Testing Engine

$37.5  $124.99

HPE0-V15 PDF + Testing Engine

$49.5  $164.99