To help you prepare for the HPE0-S60 HP exam, we are offering free HPE0-S60 HP exam questions. All you need to do is sign up, provide your details, and prepare with the free HPE0-S60 practice questions. Once you have done that, you will have access to the entire pool of Delta - HPE Compute Solutions HPE0-S60 test questions which will help you better prepare for the exam. Additionally, you can also find a range of Delta - HPE Compute Solutions resources online to help you better understand the topics covered on the exam, such as Delta - HPE Compute Solutions HPE0-S60 video tutorials, blogs, study guides, and more. Additionally, you can also practice with realistic HP HPE0-S60 exam simulations and get feedback on your progress. Finally, you can also share your progress with friends and family and get encouragement and support from them.

Questions 4

Your customer has the following HPE Synergy setup:

- 15 HPE Synergy 12000 frames with 50Gb connectivity to each server port

- 2 HPE Composer 2 modules

- 15 HPE D3940 Storage Modules, one per frame

- 2 HPE 12Gb SAS switches per frame

Which statement about this setup is true?

Options:

A.  

The customer must create at least five logical enclosures for this setup.

B.  

To manage 15 frames, additional HPE Composers are required.

C.  

The customer can install up to 12 HPE Synergy 480 compute nodes per frame.

D.  

If properly cabled, any compute node can access any HPE D3490 storage module

Discussion 0
Questions 5

Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.

When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.

What must be done to fix this issue?

Options:

A.  

Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.

B.  

To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.

C.  

The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.

D.  

Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.

Discussion 0
Rosalie
I passed. I would like to tell all students that they should definitely give Cramkey Dumps a try.
Maja (not set)
That sounds great. I'll definitely check them out. Thanks for the suggestion!
Lennie
I passed my exam and achieved wonderful score, I highly recommend it.
Emelia (not set)
I think I'll give Cramkey a try next time I take a certification exam. Thanks for the recommendation!
Reeva
Wow what a success I achieved today. Thank you so much Cramkey for amazing Dumps. All students must try it.
Amari (not set)
Wow, that's impressive. I'll definitely keep Cramkey in mind for my next exam.
Aliza
I used these dumps for my recent certification exam and I can say with certainty that they're absolutely valid dumps. The questions were very similar to what came up in the actual exam.
Jakub (not set)
That's great to hear. I am going to try them soon.
Questions 6

Your customer has a logical enclosure configured using a angle HPE Synergy frame with the following configuration

- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- two HPE Synergy Virtual Connect SE 32Gb FC Modules -12 HPE Synergy 480 Gen10 Plus compute nodes with appropriate mezzanine cards

They plan to add a new HPE Synergy frame to an existing logical enclosure with the following configuration

- two HPE Synergy Virtual Connect SE 32Gb FC Modules

- two HPE Synergy 20Gb interconnect Link Modules

- Eight HPE Synergy 480 Gen 10 Plus compute nodes with appropriate mezzanine cards

Which statement about the planned configuration change is true?

Options:

A.  

Four compute modules must be moved to the second frame to balance the configuration

B.  

The two HPE Synergy 20Gb interconnect Link Modules must be replace with the 50Gb option

C.  

A license for an extended logical enclosure must be added to HPE OneView through GUI

D.  

The HPE Synergy virtual Connect SE 32Gb FC Modules from both frames should be stacked

Discussion 0
Questions 7

Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives

The customer requested the following components:

- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules

- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- An appropriate number of vSAN Standard licenses for each compute node

- One HPE O3940 Storage Module with 40 SSDs - All required cables and options

Which statement about this request is true?

Options:

A.  

vSphere licenses should be added, as vSAN licenses do not replace vSphere licenses

B.  

vSphere Standard licenses should be replaced with Enterprise Plus licenses to enable vSAN

C.  

One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM

D.  

20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drives.

Discussion 0

HPE0-S60
PDF

$35  $99.99

HPE0-S60 Testing Engine

$42  $119.99

HPE0-S60 PDF + Testing Engine

$56  $159.99